Tuesday, December 7, 2010

Sick to commute

With CMRL work in progress in the 100 feet road, before monsoon patience to wait in the traffic saying it will clear or keep moving can reach work in 15 minutes from the main junction. I follow 3 routes and ride through small roads to reach office.
  •  Route -1 is the regular route from Ashok pillar to Guindy, avoided it after the prathkshnam one way near Udhayam. 
  • Route – 2 shortcut by Jafferkhanpet meets 100ft road at Kasi theatre junction, became road block after the ‘U’ turn removed from Virtusa. 
  • Route -3 longest one where by Nandampakkam to Office. 
After the rain flooded Chennai city the so called State Highway – 55 itself smile with bumps then and there. Imagine the 100 ft road status a very huge pit near new Hilton Hotel, half the road with CMRL blocks. Pedestrians and two wheelers really cry out.

With elections upcoming these roads will have patches plastered or full bleached needs to be seen. Longterm wait to watch CMRL really ease traffic in Cheanni city ?

No comments:

Post a Comment